{"id":5170,"date":"2011-03-03T18:30:59","date_gmt":"2011-03-03T17:30:59","guid":{"rendered":"https:\/\/www.generaleprefabbricatispa.com\/realizzazioni\/eurospin-tirrenica-spa-logistical-centre\/"},"modified":"2011-03-03T18:30:59","modified_gmt":"2011-03-03T17:30:59","slug":"eurospin-tirrenica-spa-logistical-centre","status":"publish","type":"dt_portfolio","link":"https:\/\/www.generaleprefabbricatispa.com\/en\/completed-works\/eurospin-tirrenica-spa-logistical-centre\/","title":{"rendered":"\u201cEurospin Tirrenica SpA\u201d logistical centre"},"content":{"rendered":"<p><strong>Generale prefabricati<\/strong> has constructed approximately 15,000 sqm. of the <strong>Eurospin Tirrenica<\/strong> logistical centre in Magione (PG) using a structural framework of 17&#215;25 metres and a roof with primary beams and purlins completed with steel sheets and insulation. The useful sub-beam height is 11 metres, the cladding panels are the &#8220;thermal cut&#8221; type with mould bottom finishing, then painted on-site.<\/p>\n<p>The building is perfectly and completely insulated also because it houses &#8220;cold&#8221; storage of a major distribution chain for the logistics coverage of the entire centre of Italy.<\/p>\n<p>There are 70 sectional doors and loading bays along the two loading floors.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Generale prefabricati has constructed approximately 15,000 sqm. of the Eurospin Tirrenica logistical centre in Magione (PG) using a structural framework of 17&#215;25 metres and a roof with primary beams and purlins completed with steel sheets and insulation. The useful sub-beam height is 11 metres, the cladding panels are the &#8220;thermal cut&#8221; type with mould bottom&hellip;<\/p>\n","protected":false},"author":17,"featured_media":3760,"template":"","dt_portfolio_category":[58],"dt_portfolio_tags":[],"class_list":["post-5170","dt_portfolio","type-dt_portfolio","status-publish","has-post-thumbnail","hentry","dt_portfolio_category-completed-industrialised-building-works","dt_portfolio_category-58","description-off"],"_links":{"self":[{"href":"https:\/\/www.generaleprefabbricatispa.com\/en\/wp-json\/wp\/v2\/dt_portfolio\/5170","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.generaleprefabbricatispa.com\/en\/wp-json\/wp\/v2\/dt_portfolio"}],"about":[{"href":"https:\/\/www.generaleprefabbricatispa.com\/en\/wp-json\/wp\/v2\/types\/dt_portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/www.generaleprefabbricatispa.com\/en\/wp-json\/wp\/v2\/users\/17"}],"version-history":[{"count":0,"href":"https:\/\/www.generaleprefabbricatispa.com\/en\/wp-json\/wp\/v2\/dt_portfolio\/5170\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.generaleprefabbricatispa.com\/en\/wp-json\/wp\/v2\/media\/3760"}],"wp:attachment":[{"href":"https:\/\/www.generaleprefabbricatispa.com\/en\/wp-json\/wp\/v2\/media?parent=5170"}],"wp:term":[{"taxonomy":"dt_portfolio_category","embeddable":true,"href":"https:\/\/www.generaleprefabbricatispa.com\/en\/wp-json\/wp\/v2\/dt_portfolio_category?post=5170"},{"taxonomy":"dt_portfolio_tags","embeddable":true,"href":"https:\/\/www.generaleprefabbricatispa.com\/en\/wp-json\/wp\/v2\/dt_portfolio_tags?post=5170"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}