The new POLIMI headquarters rises in place of the old Civil Hospital in an area between Ghislanzoni (north side) and its parallel Previati road (south side).
The project, sized for a population of 2,000 students, at this stage foresees the implementation of new structures for a total of 11,000 square metres and the recovery of existing buildings for approximately 5,200 square metres.
Generale Prefabbricati spa is supplying all Spiroll hollow core floor slabs from its factory in Basaluzzo (AL).